THE billions we pumped into electricity networks over the last decade or so is one of the most serious infrastructure mistakes that Australia has ever made.
We all know that we created too much network capacity, and in normal circumstances that would have rectified itself over time. But it is now apparent that our power companies and authorities have installed the wrong network systems and large amounts of electricity networking may need to be redone at a huge cost.